The race is on. Will we get the frost system in before the spring frost hit? We have a new approach. The fan system, while great in our expriments, was drawing down frozen air, even from 10m up, the neighbours complained, and asked did we have resource consent. They hated the orange tube soaring skyward to draw the air down. So down it came.
Now we have kms of 19mm pipe. We clip this to the lower wire of the vines, at 1m intervals, hard on our fingers. The trickiest part is unravelling the pipes, it is so easy to bend and fold in half and then the pipe is stuffed. We have dug a trench for the 30mm pipe and the 19mm pipes go for 3/4 of the row and then we join 13mm pipes off that. This weekend, Jeanette came over from Raumati and lay out all the flipper pipes at each post, then helped me clip the 19mm pipes to the wire. Backbreaking stuff, bending down every paced step to clip the pipe to the wire, standing, taking a step and then puting the clips on the wire. Close to the ground work, and remembering to bend at the knees is a challenge. We completed five rows, three more than we thought we would.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment